The open plan nature of the project required hardwood concertina doors to be used. This raised issues of the
long term performance of these with such a large gable above. It was decided to use a steel girder supported
by 2 box section steels to ensure the integrity of the doors. These needed insulating and boxing in with
hardwood panels.
|